Our Technology & Trade Partners
Power Generation Partners
To ensure flawless, timely delivery, we partner with the best in the energy industry, including:
-
Kerone Industries (Pyrolysis Systems)
-
Curtis Power Systems (Siemens Power Turbines, Gas and Steam)
-
Logistics partners ensuring 14–18 month delivery timelines (FOB Wilmington, NC)
Pyrolysis Technology
Partners
Pyrolysis is complex and requires experienced engineering, logistics, and environmental
management. We work with best-in-class partners to ensure reliability, safety, and
long-term profitability.
Renewable Electrical Generation
Data Center Renewable Power
We produce renewable power using steam turbines fueled by:
-
Recycled mulch
-
Downed forestry
-
Helene hurricane debris
-
Pyrolysis-derived syngas and RNG
Our systems are designed for redundancy, 24/7 availability, and zero-carbon output.
Fix Site Information
Location
Southeast McDowell County, NC
~12 minutes south of Marion
GPS: 35.584675, -81.838624
Permits & Entitlement
-
150 MW to 1.6 GW RNG Facility Entitlement in process
-
Permits issued: Grading, Erosion, & Hydrology (7/16/25)
-
Air Quality approval pending (expected during horizontal construction)
-
Permits: MCDOW-2026-0134, NCC252099
Feedstock Reliability
-
Hurricane Helene created thousands of acres of forestry debris
-
USDA’s Active Forest Management Strategy increases biomass availability
-
Our process prevents CO₂ release into the atmosphere. We recycle the forest damaged by Hurricane Helene into RNG. (Syngas)
Data Center – Facility #1
Lakeside Green Power Data Center
Built for sustainability, redundancy, and resilience, our Facility #1 includes:
-
Direct onsite power generation
-
Zero-carbon electrical supply
-
Multi-phase scalability
-
AI-optimized infrastructure