top of page

Our Technology & Trade Partners

Power Generation Partners

To ensure flawless, timely delivery, we partner with the best in the energy industry, including:

  • Kerone Industries (Pyrolysis Systems)

  • Curtis Power Systems (Siemens Power Turbines, Gas and Steam)

  • Logistics partners ensuring 14–18 month delivery timelines (FOB Wilmington, NC)

Pyrolysis Technology

Partners

Pyrolysis is complex and requires experienced engineering, logistics, and environmental

management. We work with best-in-class partners to ensure reliability, safety, and

long-term profitability.

 

 

Renewable Electrical Generation

Data Center Renewable Power

We produce renewable power using steam turbines fueled by:

  • Recycled mulch

  • Downed forestry

  • Helene hurricane debris

  • Pyrolysis-derived syngas and RNG

Our systems are designed for redundancy, 24/7 availability, and zero-carbon output.

​​

Fix Site Information

Location

Southeast McDowell County, NC
~12 minutes south of Marion
GPS: 35.584675, -81.838624

Permits & Entitlement

  • 150 MW to 1.6 GW RNG Facility Entitlement in process

  • Permits issued: Grading, Erosion, & Hydrology (7/16/25)

  • Air Quality approval pending (expected during horizontal construction)

  • Permits: MCDOW-2026-0134, NCC252099

Feedstock Reliability

  • Hurricane Helene created thousands of acres of forestry debris

  • USDA’s Active Forest Management Strategy increases biomass availability

  • Our process prevents CO₂ release into the atmosphere. We recycle the forest damaged by Hurricane Helene into RNG. (Syngas)

 

Data Center – Facility #1

Lakeside Green Power Data Center

Built for sustainability, redundancy, and resilience, our Facility #1 includes:

  • Direct onsite power generation

  • Zero-carbon electrical supply

  • Multi-phase scalability

  • AI-optimized infrastructure

image.png
image.png
image.png
image.png
image.png
image.png

© 2017 - 2025 by Lakeside Energy Inc. Created by sanctuaryadvertisingdesigns.com

bottom of page